Rooftop solar & PM Surya Ghar

Generation is usually 3.5–5 units per kW a day depending on sunshine and roof direction. Some states (e.g. Delhi) add their own subsidy on top.

Cost after subsidy

PM Surya Ghar central subsidy for homes: ₹30,000 per kW for the first 2 kW and ₹18,000 for the 3rd kW, up to ₹78,000. Apply on pmsuryaghar.gov.in through a registered vendor, for an on-grid system with net metering. Savings assume 3% yearly tariff increases and 0.5% yearly panel ageing.

Save these inputs

Saved on this device only. Find it under History, or on the home page.

Sign in

Sign in to keep your favourites, saved calculations and recent history on all your devices.

Create estimate PDF

Customer
Prepared by (remembered on this device)

Customer details are used only to make this PDF. They are not saved or sent anywhere.